• A higher level of water quality output
  • Watertight through attached 18” risers
  • Pre-treatment by ATU is often required ahead of drip dispersal
  • Enables 1/3 bed size reduction for sand mound area, and for >20″LZ at-grade beds

Gallery

Resource Docs